How we deliver
Four steps. No shortcuts. 24 to 72 hours from approval to on-site. A certified crew led by a Phoenix field lead on every project. That's how floors last 20 years instead of 3.
From call to cured
Assessment & Quote
Free, no-pressure. We diagnose your slab and spec the right system.
Fast Scheduling
Most projects start within 24-72 hours of approval.
Precision Install
Prep, coat, topcoat. Certified Phoenix crew led by a field lead.
Cure & Deliver
Walk and drive at 72 hours. Warranty activated on day one.
Assessment & Quote
Every project starts with a direct conversation — phone or on-site. We look at the slab condition, the environment it lives in, the traffic it'll see, and the timeline you need.
For commercial and industrial projects, we schedule an on-site visit to run ASTM F1869 calcium chloride and F2170 moisture tests before we quote. Slabs reading above industry thresholds (3 lb/1,000 sf/24 hr MVER or 75% RH) need moisture mitigation — and we quote that in, upfront, rather than discovering it mid-install.
What you get
- checkWritten quote with system specifications
- checkTimeline estimate (start + completion + cure)
- checkMoisture test results (commercial projects)
- checkClear scope — no surprise add-ons mid-project
Typical timeline: 24-48 hours from first contact to written quote.
Fast Scheduling
Once you approve the quote, we schedule. Most projects start within 24 to 72 hours. Commercial and industrial projects sometimes need 5-7 days of lead time for material ordering or occupied-facility sequencing — we tell you upfront.
We don't stack projects three-deep. Each crew handles one project at a time, which means no handoffs, no rushed installs, and no "we'll come back tomorrow to finish."
What we coordinate
- checkYour schedule (work hours, delivery windows, off-hours access)
- checkWeather (we don't coat in rain or direct sun on fresh primer)
- checkMaterial delivery to site
- checkSite prep (clearing, utility access)
Call now for a free assessment
Precision Install
Install is where most coatings fail — and it's where we spend most of our energy. Every crew follows the same protocol regardless of project size.
Surface Prep
Diamond grinding or shot blasting to the right CSP (Concrete Surface Profile) for the system. Crack and joint repair. HEPA-filtered vacuum throughout — minimal dust.
Primer + Body Coat
Moisture-tolerant primer (if needed per test results), then the epoxy body coat. Flakes, quartz, or color pigment broadcast while wet for decorative systems.
Topcoat
UV-stable polyaspartic topcoat on outdoor or sun-exposed installs. Chemical-resistant topcoat on healthcare or food-service installs. System-matched to the use case.
Typical install duration: Residential 1-3 days. Commercial and industrial 3-5 days minimum depending on scope and sequencing.
Cure & Deliver
After the final coat, the clock starts on cure. Florida humidity can affect cure slightly — we spec moisture-tolerant systems that handle it.
Handoff includes
- checkCare guidelines document
- checkWarranty certificate (10 years residential / 1 year commercial & industrial)
- checkSystem specifications on file for future reference
- checkDirect phone line to a company representative for any questions post-install
What we handle vs what you handle
- check_circleMoisture and slab testing
- check_circleMaterial procurement
- check_circleSurface prep (grinding, shot blasting, crack repair)
- check_circleFull coating installation
- check_circleSite cleanup and dust control
- check_circleWarranty documentation
- radio_button_checkedClearing the space (move vehicles, equipment, furniture)
- radio_button_checkedUtility access (power and water near the slab)
- radio_button_checkedStaging areas for our equipment and material
- radio_button_checkedKeeping pets and people off the coating during cure
- radio_button_checkedFollowing care guidelines post-install