Federal-grade institutional flooring
UFC-compliant coatings, security-cleared crews, documented performance. Phoenix has delivered for federal military (Avon Park AFB), state university (UF, UF Health), and county government (Volusia, Hillsborough).
Rules, specs, and accountability
Government facility work isn't commercial work with more paperwork. It's a fundamentally different spec environment — Unified Facilities Criteria (UFC) documents, Army Corps of Engineers references, state procurement requirements, and the expectation that every specification is followed to the letter with documented compliance.
Phoenix is built for that environment. Security-cleared crews, documented product data, adherence to federal and state coating specs. No substitutions, no "we'll figure it out on site."
Specs we work to
Unified Facilities Criteria (UFC)
DoD UFC documents and USACE Engineering Manuals specify coating performance, surface prep, and material types for federal facilities.
Procurement & Performance
State of Florida procurement code, county-level capital-project requirements, and documented lifecycle performance expectations.
Sherwin-Williams & Elite Crete
Federally-approved manufacturer product lines. Published technical data supports compliance documentation.
OSHA & Site Protocols
OSHA 10-30 certified crews. Background-checked personnel for secure-facility access.
We already hold active institutional contracts
From hangars to county offices
Aviation Hangars
JP-8, hydraulic fluids, jet exhaust. Fuel-resistant topcoats required.
Logistics & Vehicle Maintenance
Shop floors, motor pool, supply warehouses. Industrial-grade thickness.
Admin / HQ
Office buildings, command centers, lobbies. Decorative systems with institutional warranty.
Public-Facing
Libraries, courts, service centers, DMV. Traffic-rated with slip-resistance compliance.
Who trusts Phoenix
Avon Park Air Force Range
106,638-acre joint-service training range.
Hillsborough County
County government facility flooring.
Volusia County, FL
County government facility flooring.
Government or military project?
UFC-compliant. Security-cleared. Documented. Institutional track record with active federal, state, and county clients.
Standards & reference documentsexpand_more
- Unified Facilities Criteria (UFC) — DoD coating and surface preparation specifications.
- US Army Corps of Engineers Engineering Manuals for floor finishes.
- ASTM F1869 / F2170 for moisture testing on federal slabs.
- OSHA 10-30 certifications required for secure-facility crew access.